Your Material Estimation Process May Work. What Happens When You Must Prove It?

It doesn't start with an audit notice.

It starts on a Monday morning. Your estimator pulls a Bill of Materials (BOM) export from the Enterprise Resource Planning (ERP) system — a few hundred line items, maybe more depending on the program. They push it into a spreadsheet, cross-reference against the last submission, fill in what's changed. Then they re-enter it into the proposal: part numbers, quantities, unit costs, supplier data, line by line.

Wednesday, a design change comes through. Some quantities are wrong. They do it again.

Friday, the proposal is close. The BOM roughly matches what's in the ERP — or close enough. Nobody has time to verify every line against the source before it goes out.

This is not a broken process. It's what the process produces. And for most Aerospace and Defense (A&D) and manufacturing proposal teams, it's the cost of doing business — survivable, knowable, and rarely the thing that visibly blows a bid.

Except when it is. And when it is, the person who built that spreadsheet is the one sitting across from the auditor trying to reconstruct a decision trail that was never designed to be reconstructed.

Getting the Cost Right Is Hard. Proving It Is Harder.

Accurate cost estimation is the number one estimating and pricing challenge facing GovCon organizations — ranked first in Deltek's 2026 GovCon Clarity Report. Not competitive pricing strategy. Not market uncertainty. Getting the cost right, consistently, is the hardest part.

And the consequences of not getting it right are measurable. Thirty-eight percent of contractors cite pricing lacking auditability or defensibility as a top reason proposals weren't selected — the single most common proposal failure mode, ahead of technical deficiencies.

The proposal didn't lose on price. It lost on what the team couldn't prove.

For A&D and manufacturing firms managing material costs through manual exports and re-entry, that finding is not abstract. When the Truthful Cost or Pricing Data Act (TINA) applies and a manually assembled BOM becomes certified cost data, every handoff between your ERP and your proposal is a gap between what you submitted and what you can defend. Deltek's Clarity Report makes the divide concrete: contractors with ERP-integrated pricing workflows are 13 percentage points more confident in producing winning, defensible bids than those without. That gap doesn't come from having better estimators. It comes from having a traceable workflow — or not.

Your BOM Workflow Works Fine. Until Someone Asks to See the Trail.

If the Defense Contract Audit Agency (DCAA) asked your team today to produce the complete material cost trail for a specific line item from a submission six months ago — ERP source to proposal number — how long would that take?

For most A&D teams, the honest answer is: longer than it should.

Finding the right export from the right date. Matching it to the right version of the spreadsheet. Confirming re-entry was accurate at that point. Verifying nothing shifted during reconciliation. The process doesn't fail visibly — it just makes defensibility slow, expensive, and dependent on whoever built the model still being around to explain it.

There's a layer to this that's easy to miss until it becomes a problem. Material data doesn't just need to be accurate at submission — it needs to be structured, traceable, and enforceable before it gets there. When required fields aren't enforced at entry, when contractor-specific data requirements aren't mapped to ERP fields, when there's no audit log of what changed and when — the gap between what your system knows and what your proposal can defend widens with every bid.

The Contracts That Need Certified Cost Data Just Got Bigger. And Harder to Defend.

The TINA threshold moves to $10 million on July 1, 2026. Fewer contracts will require certified cost and pricing data — but for the ones that do, the complexity goes up, not down.

Larger contracts mean more complex BOMs. More line items, more subcontractors, more ERP data sources to reconcile. More scrutiny on every dollar. The firms that feel this most aren't managing a handful of small programs manually — they're the ones where proposal complexity has scaled faster than the estimation workflow evolved to support it.

A process that held up at $6M starts to show its limits at $15M — not because the team suddenly became less efficient, but because disconnected workflows don't scale with complexity.

What It Looks Like When the Audit Trail Builds Itself.

The goal isn't to redesign how your estimators work. It's to remove the steps that don't add value to what they do.

BOM data should flow from the ERP directly into a structured estimation environment — not through an export that's already one step removed from the system of record. Required fields should be enforced at entry, not chased down after the fact. Contractor-specific data requirements and ERP field mappings — whether that's Costpoint or another system — should be configured once and applied consistently across every proposal, not rebuilt each time. When data is refreshed from an external source, estimators should be able to do it in bulk, with validation, not row by row.

And when a line item gets questioned, the answer should be in the system. Not in someone's memory. Not in a spreadsheet tab that may or may not match the submission version.

That's not an aspirational workflow. It's what a connected, governed estimation process looks like — and the difference between it and what most A&D teams are running today isn't complexity. It's whether the audit trail exists because it was built that way, or has to be reconstructed because it wasn't.

 

The way material estimation gets done is changing. And not incrementally.

If your team is still reconciling BOM data manually between your ERP and your proposal system, the gap between what you can submit and what you can defend is only going to widen. There's a better way to run this — and we'd like to show you what that looks like for teams like yours.

Contributors

Author

Padma Raghunathan

Padma Raghunathan

Senior Product Marketing Manager

Padma is a Senior Product Marketing Manager for Government Contracting, specializing in pricing, manufacturing and quality solutions for the aerospace and defense (A&D) industries. She drives impactful go-to-market (GTM) strategies and delivers high-value solutions to customers.

Featured Thoughts

Top 10 FY 2027 Federal Set-Aside Opportunities

Article

Federal Set-Aside Opportunities and SBA Small Business Size Standards for FY 2027

This article summarizes Deltek’s GovWin IQ research on the top 10 federal small business set-aside opportunities for FY 2027 and the SBA’s proposed size standard changes.

Professionals in a meeting overlooking the U.S. Capitol

Article

DoW May Ask for Your Actual Costs. What Happens When the Request Lands?

DoW’s cost and pricing guidance gives contracting officers more room to request actual costs when needed to support a price. Learn what changed, what didn’t, and how connected pricing, execution and accounting data helps teams respond.

Dela

Article

Stop Switching Tabs: Your Favorite AI Tools Now Work With Costpoint Through MCP

This article explains how Costpoint now supports Model Context Protocol (MCP), so Dela can reach approved outside tools and the AI tools your teams already use can work with Costpoint. It shows how that cuts the time spent switching between systems, with administrators deciding which connections exist.

Businessman using his digital tablet

Article

Smarter Business Development: Pairing Analyst Expertise with Artificial Intelligence in GovWin IQ

Deltek’s newest AI-powered features within GovWin IQ are helping government contractors gain greater business development efficiency and productivity.

An IT technician works on a laptop in a glass-walled server room.

Article

CMMC Checklist: Prepare for CMMC 2.0 And Beyond

CMMC Phase 2 third-party certification is suspended for review, but NIST 800-171 self-assessment remains mandatory. Use this checklist to stay audit-ready.