Professionals in meeting room overlooking the U.S. Capitol

What the New TINA Threshold Actually Changes for A&D Contractors

On July 1, 2026, the threshold for the Truthful Cost or Pricing Data Act (TINA) moved to $10 million. In practical terms, that means fewer contracts will require certified cost and pricing data than before.

Read quickly, that sounds like good news for aerospace and defense (A&D) and manufacturing contractors. Read carefully, it isn't quite that simple. The threshold changes which contracts require certified cost and pricing data — not the expectations for the contracts that still do.

Fewer Contracts, Not Less Scrutiny

The threshold change narrows which contracts require certified data. It doesn't narrow how carefully those contracts get examined once they clear that bar. If anything, the opposite is true. The contracts that still require certified cost and pricing data are, by definition, the larger ones, and larger contracts tend to bring more complexity with them: more line items, more subcontractors, more Bill of Materials (BOM) data pulled from more sources within the Enterprise Resource Planning (ERP) system.

So the pool of contracts under TINA gets smaller, while the average complexity of what's left in that pool goes up. For many contractors, that also means the material estimation and proposal pricing workflow supporting those bids becomes even more important. For the estimating teams working on those programs, that's a different kind of pressure than before, not lighter, just more concentrated.

Why Manual Estimation Feels This Shift First

A material estimation process built around exporting BOM data, reconciling it in a spreadsheet, and re-entering it into a proposal can hold up reasonably well on a smaller program. The number of line items is manageable, the reconciliation is tedious but doable, and the odds of catching a discrepancy before submission are decent.

That same process doesn't necessarily scale the same way on a $15 million program that it did on a $6 million one. Reconciliation effort tends to grow with BOM complexity, not at the same rate as contract value. More components, more design changes, more supplier updates each mean another pass through the same manual steps, and each pass is another chance for something to shift between the ERP and the proposal without anyone noticing until later.

This isn't a comment on the estimators doing that work. It's a comment on what the process asks of them as complexity increases, and where that process was never designed to flex.

What "Harder to Manage" Looks Like in Practice

The moment this becomes concrete is usually an audit question, not a proposal deadline. If the Defense Contract Audit Agency (DCAA) asks about a specific material line item from a submission several months earlier, the answer requires finding the right export, matching it to the right version of the spreadsheet, and confirming nothing changed during reconciliation. On a larger, more complex program, there are simply more places for that trail to get harder to reconstruct.

That is the practical shape of "getting harder to manage." Not that the work is impossible, but that certified cost data now carries more weight per contract, on programs where the underlying material data has more places to lose its connection to the source.

Where a Connected Workflow Fits In

This is exactly the workflow gap many A&D contractors are trying to close. That’s why Deltek built a material estimating capability directly into BOE Pro, part of Deltek ProPricer- the tool many A&D and manufacturing teams already use to build proposal cost estimates. Rather than exporting BOM data from an ERP like Deltek Costpoint or SAP and reconciling it by hand, the material estimating capability connects to that ERP directly, so the material data behind a proposal reflects the source system without a manual step in between.

The point isn't that this makes complexity disappear. It's that it removes the specific place where complexity used to turn into version risk, the export-and-reconcile step that gets harder to manage precisely as programs get larger. The result is a more governed, traceable workflow from ERP to proposal, especially as proposal complexity continues to increase.

If you want to see how that workflow moves from ERP to proposal in more detail, the on-demand recording of our recent webinar walks through it.

Webinar

Connect Material Estimation and Proposal Pricing

Improve traceability across estimating and pricing workflows while reducing manual effort and supporting compliance objectives.

Contributors

Author

deltek company logo

Deltek

Deltek experts and industry thought leaders share their views on the latest trends, technology and issues shaping project-based businesses today.

Featured Thoughts

Aerial View of the Pentagon

Article

The Door to Government Contracting Just Got Wider

This article breaks down DoW’s memo raising the Cost Accounting Standards threshold to $100 million, covering what’s changing, what isn’t, and why cost visibility still matters for contractors either way.

Two professionals collaborate at a workstation, reviewing software code on dual monitors in a modern office environment

Article

BOE Pro's First Dela Agent is Here. So is a More Consistent Cost Volume Pro.

The ProPricer Q3 2026 release introduces guided BOE authoring, Dela-powered BOE drafting, and new Cost Volume Pro enhancements that improve consistency across proposal content. These updates take time out of the manual mechanics of estimating and cost volume production, so estimating and proposal teams can spend more of it on the estimate and the proposal itself.

Professional working at a computer workstation

Article

10 Signs Your Services Proposal Pricing Process Is Audit Ready

Services proposal pricing is becoming more difficult as government contractors face growing expectations for transparency, traceability, and accountability. Ten common characteristics can help organizations assess whether their pricing process supports audit readiness. The checklist focuses on data traceability, labor category management, governance, efficiency, and scalability.

Aerial view of the Pentagon and surrounding road network

Article

The Pentagon Wants In: What DoW’s New Pricing Memo Means for Your Proposals

A new DoW memo pushes for full cost and pricing transparency across every contractor tier, including a proposal to pull data directly from contractor systems. Here's what the memo proposes to change, what it doesn't say, and how contractors can get ahead of it.

GovCon Webinar

Webinar

From OTA to FAR: Pricing Discipline That Scales with Mission Growth

Winning innovative work is only the beginning. As contractors grow across OTAs, SBIRs, CSOs, and FAR-based contracts, pricing capabilities must scale with the business. Learn how leading firms build pricing maturity to compete, execute, and grow.